EQIP in The United States
The United States
Environmental Quality Incentives Program (EQIP) in the United States
EQIP payments by fiscal year in the United States
EQIP payments by state, 2017-2022
Practices on EQIP acres, 2017-2022, the United States
Rank | Practice | Payments, 2017-2022 |
---|---|---|
1 | Cover Crop | $504,812,892 |
2 | Brush Management | $314,991,152 |
3 | Sprinkler System | $313,561,007 |
4 | Fence | $311,036,533 |
5 | Waste Storage Facility | $252,142,865 |
6 | Irrigation Pipeline | $230,101,825 |
7 | Roofs and Covers | $228,568,531 |
8 | Irrigation System- Microirrigation | $175,194,972 |
9 | Livestock Pipeline | $162,365,526 |
10 | Forest Stand Improvement | $159,735,684 |
11 | Forage and Biomass Planting | $139,812,458 |
12 | Heavy Use Area Protection | $128,126,390 |
13 | Combustion System Improvement | $127,321,059 |
14 | Tree & Shrub Establishment | $118,064,737 |
15 | Pumping Plant | $114,617,827 |
16 | Watering Facility | $112,780,394 |
17 | High Tunnel System | $110,995,478 |
18 | Nutrient Management | $81,586,438 |
19 | Water Well | $80,280,437 |
20 | Prescribed Grazing | $77,459,321 |
21 | Underground Outlet | $75,347,920 |
22 | Tree/Shrub Site Preparation | $74,901,646 |
23 | Structure for Water Control | $70,996,385 |
24 | Terrace | $67,381,899 |
25 | Grade Stabilization Structure | $63,507,222 |
26 | Range Planting | $60,883,284 |
27 | Energy Efficient Agricultural Operation | $58,300,881 |
28 | Irrigation Land Leveling | $57,403,380 |
29 | Woody Residue Treatment | $56,021,803 |
30 | Streambank and Shoreline Protection | $55,715,214 |
31 | Animal Mortality Facility | $54,270,302 |
32 | Herbaceous Weed Treatment | $51,465,500 |
33 | Conservation Crop Rotation | $49,543,213 |
34 | Energy Efficient Building Envelope | $44,563,115 |
35 | Irrigation Water Management | $38,406,423 |
36 | Obstruction Removal | $38,222,552 |
37 | Prescribed Burning | $38,056,513 |
38 | Residue & Tillage Management-No Till/Strip Till (Ac.) | $37,016,498 |
39 | Waste Transfer | $35,335,917 |
40 | Conservation Cover | $34,892,188 |
41 | Firebreak | $29,062,187 |
42 | Res. & Tillage Mgt- Mulch-till | $28,131,937 |
43 | Pond | $27,173,225 |
44 | Access Road | $25,705,044 |
45 | Mulching | $25,700,071 |
46 | Water and Sediment Control Basin | $24,610,557 |
47 | Grassed Waterway | $24,548,815 |
48 | Stream Crossing | $23,010,335 |
49 | Irrigation Reservoir | $22,890,790 |
50 | Upland Wildlife Habitat Management | $21,784,101 |
51 | Comprehensive Nutrient Management Plan | $21,491,465 |
52 | Trails and Walkways | $20,977,150 |
53 | Forest Management Plan | $19,854,007 |
54 | Waste Facility Closure | $18,068,921 |
55 | Dike or Levee | $17,822,484 |
56 | Early Successional Habitat Development-Mgt | $15,184,642 |
57 | Subsurface Drain | $15,015,410 |
58 | Precision Land Forming and Smoothing | $13,374,958 |
59 | Restoration of Rare or Declining Natural Communities | $13,121,110 |
60 | Pest Management Conservation System | $13,027,881 |
61 | Wetland Wildlife Habitat Management | $11,985,753 |
62 | Stream Habitat Improvement and Management | $11,605,722 |
63 | Pond Sealing or Lining - Concrete | $11,526,547 |
64 | Energy Efficient Lighting System | $11,519,095 |
65 | Critical Area Planting | $11,506,081 |
66 | Irrigation Ditch Lining | $11,190,220 |
67 | Roof Runoff Structure | $10,928,098 |
68 | Solid/Liquid Waste Separation Facility | $10,042,322 |
69 | Irrigation System- Surface and Subsurface | $9,837,349 |
70 | Aquatic Organism Passage | $9,652,824 |
71 | Pond Sealing or Lining- Geomembrane or Geosynthetic Clay Liner | $9,303,088 |
72 | Pond Sealing or Lining- Flexible Membrane | $9,167,940 |
73 | Lined Waterway or Outlet | $8,948,847 |
74 | Agrichemical Handling Facility | $7,865,557 |
75 | Wildlife Habitat Planting | $7,714,492 |
76 | Fuel Break | $7,127,314 |
77 | Land Smoothing | $6,866,182 |
78 | Amendments for Treatment of Agricultural Waste | $6,861,417 |
79 | Windbreak/Shelterbelt Establishment | $6,594,078 |
80 | Diversion | $6,424,020 |
81 | Agricultural Energy Management Plan - Written | $5,909,907 |
82 | Channel Bed Stabilization | $5,150,207 |
83 | Anaerobic Digester | $5,007,524 |
84 | Nutrient Management Plan - Written | $4,926,569 |
85 | Tree/Shrub Pruning | $4,864,285 |
86 | Forest Trails and Landings | $4,403,306 |
87 | Waste Treatment | $4,141,094 |
88 | Field Operations Emissions Reduction | $3,805,863 |
89 | Emergency Animal Mortality Management | $3,789,599 |
90 | Windbreak/Shelterbelt Renovation | $3,551,133 |
91 | Forage Harvest Management | $3,322,703 |
92 | Spring Development | $3,308,418 |
93 | Riparian Forest Buffer | $3,134,663 |
94 | Edge-of-Field Water Quality Monitoring-Data Collection and Evaluation | $3,035,922 |
95 | Clearing and Snagging | $2,812,087 |
96 | Structures for Wildlife | $2,799,625 |
97 | Dust Control on Unpaved Roads and Surfaces | $2,727,230 |
98 | Pond Sealing or Lining- Compacted Soil Treatment | $2,635,690 |
99 | Irrigation and Drainage Tailwater Recovery | $2,609,336 |
100 | Composting Facility | $2,464,528 |
101 | On-Farm Secondary Containment Facility | $2,453,776 |
102 | Access Control | $2,387,860 |
103 | Hedgerow Planting | $2,165,644 |
104 | Wetland Restoration | $2,003,904 |
105 | Water Harvesting Catchment | $1,966,955 |
106 | Pond Sealing or Lining- Compacted Clay Treatment | $1,958,277 |
107 | Land Clearing | $1,944,646 |
108 | Amending Soil Properties with Gypsum Products | $1,877,264 |
109 | Silvopasture | $1,830,957 |
110 | Field Border | $1,773,821 |
111 | Conservation Plan Supporting Organic Transition | $1,679,118 |
112 | Bivalve Aquaculture Gear and Biofouling Control | $1,653,212 |
113 | Open Channel | $1,480,316 |
114 | Well Decommissioning | $1,416,525 |
115 | Irrigation Water Management Plan - Written | $1,287,970 |
116 | Feral Swine Management Conservation Activity - Interim | $1,194,955 |
117 | Vegetated Treatment Area | $1,172,512 |
118 | Equitable Relief Payment | $1,109,219 |
119 | Integrated Pest Management Plan - Written | $1,091,123 |
120 | Grazing Land Mechanical Treatment | $922,803 |
121 | Spoil Disposal | $914,728 |
122 | Dam- Diversion | $834,144 |
123 | Edge-of-Field Water Quality Monitoring– System Installation | $757,115 |
124 | Shallow Water Development and Management | $719,614 |
125 | Salinity and Sodic Soil Management | $699,512 |
126 | Wetland Creation | $696,984 |
127 | Other Payment | $607,017 |
128 | Forest Farming | $592,171 |
129 | Waste Treatment Lagoon | $559,548 |
130 | Sinkhole Treatment | $526,068 |
131 | Riparian Herbaceous Cover | $487,616 |
132 | Grazing Management Plan - Written | $474,073 |
133 | Deep Tillage | $471,832 |
134 | Sediment Basin | $453,685 |
135 | Waste Recycling | $445,645 |
136 | Erroneous Underpayment | $393,775 |
137 | Fueling Facility- Above Ground Storage | $384,916 |
138 | Livestock Confinement Facility | $352,776 |
139 | Wetland Enhancement | $347,787 |
140 | IPM Herbicide Resistance Weed Conservation Plan - Written | $336,613 |
141 | Pollinator Habitat Plan - Written | $314,131 |
142 | Vegetative Barrier | $294,142 |
143 | Surface Drain- Main or Lateral | $284,443 |
144 | Filter Strip | $254,237 |
145 | Surface Drain- Field Ditch | $251,254 |
146 | Denitrifying Bioreactor | $246,001 |
147 | Fish and Wildlife Habitat Plan - Written | $240,106 |
148 | Road/Trail/Landing Closure and Treatment | $235,952 |
149 | Controlled Traffic Farming | $229,175 |
150 | Pond Sealing or Lining- Soil Dispersant | $228,991 |
151 | Drainage Water Management | $226,465 |
152 | Aquaculture Pond | $216,878 |
153 | Irrigation Water Conveyance - High Pressure Underground Plastic | $197,397 |
154 | Dam | $178,373 |
155 | IWC Ditch Lining- Plain Concrete | $161,326 |
156 | Stormwater Runoff Control | $160,219 |
157 | Reduced Water and Energy Coffee Conveyance System | $151,641 |
158 | Constructed Wetland | $150,272 |
159 | Drainage Ditch Covering | $150,005 |
160 | Pond Sealing or Lining- Soil Cement | $136,302 |
161 | Pond Sealing or Lining- Bentonite Sealant | $127,734 |
162 | Field Operations Emissions Reduction | $119,755 |
163 | Judicial or NAD Payment | $115,704 |
164 | Drainage Water Management Plan - Written | $109,344 |
165 | Prescribed Burning Plan - Written | $108,553 |
166 | Mine Shaft and Adit Closing | $94,038 |
167 | Groundwater Testing | $91,750 |
168 | Hillside Ditch | $85,764 |
169 | Irrigation Field Ditch | $79,032 |
170 | Fish and Wildlife Structure | $68,983 |
171 | Individual Terrace | $65,855 |
172 | Denitrifying Bioreactor | $61,843 |
173 | Monitoring and Evaluation | $61,311 |
174 | Agricultural Secondary Containment Facility | $57,673 |
175 | Feed Management | $54,100 |
176 | Residue Management- Seasonal | $45,353 |
177 | Agricultural Energy Management Plan-Headquarters (AgEMP) | $40,965 |
178 | Irrigation Canal or Lateral | $38,908 |
179 | Livestock Shade Structure | $38,082 |
180 | Alley Cropping | $36,178 |
181 | Contour Buffer Strips | $31,686 |
182 | Control Traffic Farming | $29,308 |
183 | Saturated Buffer | $24,888 |
184 | Precision Pest Control Application | $21,363 |
185 | Fishpond Management | $20,378 |
186 | Residue and Tillage Management - Ridge Till | $15,046 |
187 | Stripcropping | $13,946 |
188 | Vertical Drain | $12,731 |
189 | Agricultural Energy Management Plan-Landscape (AgEMP) | $12,401 |
190 | Contour Farming | $11,382 |
191 | Contour Orchard and Other Perennial Crops | $11,262 |
192 | Irrigation Water Conveyance - Canal Lining | $9,435 |
193 | Anionic Polyacrylamide (PAM) Application | $8,767 |
194 | Dust Control on Unpaved Roads and Surfaces | $7,530 |
195 | Trails and Walkways | $6,781 |
196 | Dry Hydrant | $5,247 |
197 | Channel Bank Vegetation | $3,221 |
198 | Irrigation Water Conveyance - Low Pressure Underground Plastic | $3,078 |
199 | Herbaceous Wind Barriers | $2,193 |
200 | Row Arrangement | $1,526 |
201 | Vegetated Subsurface Drain Outlet | $1,232 |
202 | Infiltration Ditches | $1,076 |
203 | Herbaceous Weed Control | $923 |
204 | Well Plugging | $259 |
205 | Water Well Disinfection | $216 |
Show All | ||
Show Less | ||
Total Payments, 2017-2022 | 5,540,768,921 |
NRCS 2024 climate smart practice.
NRCS 2024 provisional climate smart practice.
NCRS climate smart practices on EQIP acres, 2017-2022, the United States
Rank | Practice | Payments, 2017-2022 |
---|---|---|
1 | Cover Crop | $504,812,892 |
2 | Brush Management | $314,991,152 |
3 | Sprinkler System | $313,561,007 |
4 | Waste Storage Facility | $252,142,865 |
5 | Irrigation Pipeline | $230,101,825 |
6 | Roofs and Covers | $228,568,531 |
7 | Irrigation System- Microirrigation | $175,194,972 |
8 | Forest Stand Improvement | $159,735,684 |
9 | Forage and Biomass Planting | $139,812,458 |
10 | Combustion System Improvement | $127,321,059 |
11 | Tree & Shrub Establishment | $118,064,737 |
12 | Pumping Plant | $114,617,827 |
13 | Nutrient Management | $81,586,438 |
14 | Prescribed Grazing | $77,459,321 |
15 | Range Planting | $60,883,284 |
16 | Energy Efficient Agricultural Operation | $58,300,881 |
17 | Woody Residue Treatment | $56,021,803 |
18 | Herbaceous Weed Treatment | $51,465,500 |
19 | Conservation Crop Rotation | $49,543,213 |
20 | Energy Efficient Building Envelope | $44,563,115 |
21 | Irrigation Water Management | $38,406,423 |
22 | Prescribed Burning | $38,056,513 |
23 | Residue & Tillage Management-No Till/Strip Till (Ac.) | $37,016,498 |
24 | Conservation Cover | $34,892,188 |
25 | Res. & Tillage Mgt- Mulch-till | $28,131,937 |
26 | Mulching | $25,700,071 |
27 | Grassed Waterway | $24,548,815 |
28 | Restoration of Rare or Declining Natural Communities | $13,121,110 |
29 | Energy Efficient Lighting System | $11,519,095 |
30 | Critical Area Planting | $11,506,081 |
31 | Solid/Liquid Waste Separation Facility | $10,042,322 |
32 | Wildlife Habitat Planting | $7,714,492 |
33 | Fuel Break | $7,127,314 |
34 | Windbreak/Shelterbelt Establishment | $6,594,078 |
35 | Anaerobic Digester | $5,007,524 |
36 | Riparian Forest Buffer | $3,134,663 |
37 | Composting Facility | $2,464,528 |
38 | Hedgerow Planting | $2,165,644 |
39 | Wetland Restoration | $2,003,904 |
40 | Silvopasture | $1,830,957 |
41 | Field Border | $1,773,821 |
42 | Forest Farming | $592,171 |
43 | Riparian Herbaceous Cover | $487,616 |
44 | Vegetative Barrier | $294,142 |
45 | Filter Strip | $254,237 |
46 | Feed Management | $54,100 |
47 | Alley Cropping | $36,178 |
48 | Contour Buffer Strips | $31,686 |
49 | Stripcropping | $13,946 |
50 | Herbaceous Wind Barriers | $2,193 |
Show All | ||
Show Less | ||
Total Climate Smart EQIP payments, 2017-2022 | $3,473,272,812 | |
Climate Smart EQIP payments, 2017-2022 | $1,343,497,849 | |
Provisional Climate Smart EQIP payments, 2017-2022 | $2,129,774,963 |
NRCS 2024 climate smart practice.
NRCS 2024 provisional climate smart practice.
EQIP payments by state, 2017-2021
Rank | State | EQIP Payments, 2017-2022 |
---|---|---|
1 | Texas | $500,940,071 |
2 | California | $459,430,436 |
3 | Mississippi | $233,493,886 |
4 | Arkansas | $203,069,190 |
5 | Georgia | $200,257,376 |
6 | Colorado | $160,749,703 |
7 | Missouri | $156,942,428 |
8 | Wisconsin | $146,821,313 |
9 | Tennessee | $142,624,776 |
10 | Kansas | $140,208,541 |
11 | Iowa | $132,013,058 |
12 | Nebraska | $128,209,377 |
13 | Indiana | $120,627,855 |
14 | Minnesota | $118,764,811 |
15 | South Carolina | $117,435,912 |
16 | Ohio | $113,754,670 |
17 | New Mexico | $112,818,976 |
18 | Utah | $112,319,286 |
19 | Alabama | $111,549,713 |
20 | Oklahoma | $109,648,242 |
21 | Oregon | $108,535,840 |
22 | Montana | $108,470,195 |
23 | North Carolina | $105,226,546 |
24 | Virginia | $101,232,430 |
25 | Louisiana | $98,961,545 |
26 | Pennsylvania | $96,542,912 |
27 | Florida | $87,938,979 |
28 | North Dakota | $84,414,606 |
29 | Idaho | $80,725,841 |
30 | Michigan | $78,637,486 |
31 | South Dakota | $76,141,377 |
32 | Kentucky | $75,597,646 |
33 | Washington | $72,577,923 |
34 | Illinois | $61,699,444 |
35 | Wyoming | $61,114,823 |
36 | Arizona | $60,379,303 |
37 | New York | $60,220,208 |
38 | Maine | $54,635,515 |
39 | Maryland | $49,633,102 |
40 | Vermont | $43,299,530 |
41 | Puerto Rico | $39,919,434 |
42 | West Virginia | $38,071,195 |
43 | Delaware | $37,463,668 |
44 | Alaska | $34,259,008 |
45 | Nevada | $31,453,641 |
46 | Hawaii | $26,430,284 |
47 | New Hampshire | $16,926,244 |
48 | New Jersey | $16,686,161 |
49 | Massachusetts | $15,367,229 |
50 | Connecticut | $14,953,947 |
51 | Rhode Island | $8,625,266 |
52 | Northern Mariana Islands | $843,791 |
53 | American Samoa | $330,610 |
54 | Virgin Islands of the U.S | $225,768 |
55 | Guam | $13,392 |
Show All | ||
Show Less |
USDA Census of Agriculture Data for the United States, 2022
Land in the United States, 2022
Land type | Acres |
---|---|
Number of Farms: | 1,900,487 |
Total Acres in Farms: | 880,100,848 |
Cropland Acres: | 382,356,350 |
Permanent pasture and rangeland: | 392,981,662 |
Woodland Acres: | 72,066,694 |
Livestock in the United States, 2022
Livestock | Number of Animals |
---|---|
Broilers and other meat-type chickens sold | 9,176,809,391 |
Layers inventory | 388,509,039 |
Cattle and calves inventory | 87,954,742 |
Hogs and pigs inventory | 73,817,751 |
Sheep and lambs inventory | 5,104,328 |