1 | Sprinkler System | $24,125,053 |
2 | Brush Management | $11,099,825 |
3 | Irrigation Pipeline | $10,645,434 |
4 | Range Planting  | $4,340,674 |
5 | Livestock Pipeline | $3,216,484 |
6 | Woody Residue Treatment | $2,521,967 |
7 | Fence | $2,386,723 |
8 | Pumping Plant | $2,079,928 |
9 | Streambank and Shoreline Protection | $1,558,147 |
10 | Structure for Water Control | $1,480,080 |
11 | Irrigation Ditch Lining | $1,463,158 |
12 | Watering Facility | $1,306,570 |
13 | Cover Crop  | $1,051,366 |
14 | Forest Stand Improvement | $946,119 |
15 | Irrigation Land Leveling | $883,918 |
16 | Terrace | $832,228 |
17 | High Tunnel System | $719,580 |
18 | Herbaceous Weed Treatment | $703,382 |
19 | TA Design | $623,599 |
20 | Irrigation Reservoir | $449,455 |
21 | Waste Transfer | $423,526 |
22 | Solid/Liquid Waste Separation Facility  | $388,055 |
23 | Waste Storage Facility | $383,018 |
24 | Water Well | $345,965 |
25 | Irrigation System- Microirrigation | $310,922 |
26 | Obstruction Removal | $293,036 |
27 | Prescribed Grazing  | $273,234 |
28 | Pond Sealing or Lining- Flexible Membrane | $260,517 |
29 | TA Application | $223,973 |
30 | Forage and Biomass Planting  | $219,423 |
31 | Stream Habitat Improvement and Management | $213,855 |
32 | Upland Wildlife Habitat Management  | $211,981 |
33 | Pond Sealing or Lining- Compacted Soil Treatment | $202,854 |
34 | Irrigation System- Surface and Subsurface | $200,997 |
35 | Irrigation Water Management  | $189,358 |
36 | TA Check-Out | $178,889 |
37 | Waste Recycling | $150,000 |
38 | Pond Sealing or Lining- Compacted Clay Treatment | $128,478 |
39 | Conservation Cover  | $113,466 |
40 | Channel Bed Stabilization | $107,844 |
41 | Pest Management Conservation System | $88,904 |
42 | Stream Crossing | $75,924 |
43 | Clearing and Snagging | $75,773 |
44 | Heavy Use Area Protection | $70,949 |
45 | Spring Development | $57,092 |
46 | Nutrient Management  | $55,107 |
47 | Res. & Tillage Mgt- Mulch-till  | $50,876 |
48 | Residue & Tillage Management-No Till/Strip Till (Ac.)  | $42,102 |
49 | Open Channel | $41,840 |
50 | Seasonal High Tunnel for Crops | $39,819 |
51 | Energy Efficient Lighting System | $37,349 |
52 | Grade Stabilization Structure | $32,121 |
53 | Agricultural Energy Management Plan - Written | $28,610 |
54 | Comprehensive Nutrient Management Plan | $26,509 |
55 | Water and Sediment Control Basin | $22,701 |
56 | Pond Sealing or Lining- Bentonite Sealant | $21,763 |
57 | Tree & Shrub Establishment  | $17,949 |
58 | Structures for Wildlife | $17,616 |
59 | Equitable Relief Payment | $16,026 |
60 | Energy Efficient Agricultural Operation | $13,032 |
61 | Riparian Herbaceous Cover  | $12,571 |
62 | Diversion | $12,073 |
63 | Irrigation Water Management Plan - Written | $11,827 |
64 | Pond | $11,297 |
65 | Critical Area Planting | $10,382 |
66 | Windbreak/Shelterbelt Establishment  | $10,086 |
67 | Grassed Waterway  | $9,346 |
68 | Pollinator Habitat Plan - Written | $8,818 |
69 | Riparian Forest Buffer  | $8,045 |
70 | Water Harvesting Catchment | $7,289 |
71 | Mulching  | $7,162 |
72 | Access Road | $6,636 |
73 | Waste Treatment | $6,455 |
74 | Pond Sealing or Lining- Geomembrane or Geosynthetic Clay Liner | $5,634 |
75 | Lined Waterway or Outlet | $4,238 |
76 | Irrigation Canal or Lateral | $3,709 |
77 | Fuel Break | $3,266 |
78 | Firebreak | $2,586 |
79 | Forest Management Plan | $2,318 |
80 | Spoil Disposal | $2,053 |
81 | Hedgerow Planting  | $1,866 |
82 | On-Farm Secondary Containment Facility | $1,710 |
83 | Precision Land Forming and Smoothing | $1,494 |
84 | Prescribed Burning | $1,432 |
85 | Conservation Crop Rotation  | $966 |
86 | Restoration of Rare or Declining Natural Communities | $941 |
87 | Filter Strip  | $874 |
88 | Roof Runoff Structure | $810 |
89 | Other Payment | $681 |
90 | Deep Tillage | $659 |
91 | Trails and Walkways | $367 |
92 | Energy Efficient Building Envelope | $148 |
93 | Tree/Shrub Site Preparation | $64 |
Show All |
Show Less |
| Total Payments, 2017-2020 | 78,242,950 |