1 | Cover Crop  | $341,316,525 |
2 | Sprinkler System | $216,551,811 |
3 | Fence | $211,866,775 |
4 | Brush Management | $209,283,502 |
5 | Waste Storage Facility | $174,204,506 |
6 | Irrigation Pipeline | $163,052,611 |
7 | Irrigation System- Microirrigation | $119,646,285 |
8 | Roofs and Covers | $116,451,835 |
9 | Livestock Pipeline | $107,599,300 |
10 | Forest Stand Improvement | $99,330,495 |
11 | Forage and Biomass Planting  | $95,889,452 |
12 | Heavy Use Area Protection | $85,426,669 |
13 | Combustion System Improvement | $83,114,606 |
14 | Pumping Plant | $81,744,829 |
15 | Watering Facility | $75,486,700 |
16 | High Tunnel System | $74,147,545 |
17 | Tree & Shrub Establishment  | $68,280,753 |
18 | Water Well | $56,890,106 |
19 | Prescribed Grazing  | $50,467,575 |
20 | Nutrient Management  | $48,643,124 |
21 | Underground Outlet | $48,264,111 |
22 | Structure for Water Control | $47,887,093 |
23 | Tree/Shrub Site Preparation | $47,014,602 |
24 | Terrace | $45,644,302 |
25 | Range Planting  | $44,496,606 |
26 | Irrigation Land Leveling | $42,984,137 |
27 | Grade Stabilization Structure | $40,334,157 |
28 | Conservation Crop Rotation  | $38,858,566 |
29 | Energy Efficient Agricultural Operation | $37,928,247 |
30 | Woody Residue Treatment | $36,028,328 |
31 | Animal Mortality Facility | $34,910,309 |
32 | Streambank and Shoreline Protection | $34,572,952 |
33 | Obstruction Removal | $29,689,542 |
34 | Herbaceous Weed Treatment | $29,680,823 |
35 | Energy Efficient Building Envelope | $29,303,377 |
36 | Irrigation Water Management  | $26,505,617 |
37 | Prescribed Burning | $23,767,699 |
38 | Waste Transfer | $22,905,601 |
39 | Conservation Cover  | $21,000,717 |
40 | Res. & Tillage Mgt- Mulch-till  | $20,079,614 |
41 | Residue & Tillage Management-No Till/Strip Till (Ac.)  | $19,675,889 |
42 | Firebreak | $18,607,195 |
43 | Pond | $18,087,300 |
44 | Access Road | $16,667,993 |
45 | Water and Sediment Control Basin | $15,757,670 |
46 | Mulching  | $15,566,932 |
47 | Comprehensive Nutrient Management Plan | $15,095,332 |
48 | Upland Wildlife Habitat Management  | $14,915,012 |
49 | Irrigation Reservoir | $14,768,315 |
50 | Grassed Waterway  | $14,439,998 |
51 | Stream Crossing | $13,656,746 |
52 | Forest Management Plan | $12,210,712 |
53 | Trails and Walkways | $11,689,960 |
54 | Dike or Levee | $11,555,831 |
55 | Waste Facility Closure | $11,060,316 |
56 | Subsurface Drain | $10,590,944 |
57 | Early Successional Habitat Development-Mgt | $9,794,783 |
58 | Energy Efficient Lighting System | $9,772,752 |
59 | Precision Land Forming and Smoothing | $8,789,081 |
60 | Pest Management Conservation System | $8,226,109 |
61 | Irrigation Ditch Lining | $7,982,183 |
62 | Pond Sealing or Lining- Flexible Membrane | $7,811,140 |
63 | Aquatic Organism Passage | $7,569,215 |
64 | Irrigation System- Surface and Subsurface | $7,131,579 |
65 | Agrichemical Handling Facility | $6,758,754 |
66 | Stream Habitat Improvement and Management | $6,434,399 |
67 | Restoration of Rare or Declining Natural Communities | $6,379,107 |
68 | Roof Runoff Structure | $6,266,669 |
69 | Solid/Liquid Waste Separation Facility  | $6,252,498 |
70 | Amendments for Treatment of Agricultural Waste | $5,782,090 |
71 | Pond Sealing or Lining - Concrete | $5,723,372 |
72 | Fuel Break | $5,566,540 |
73 | Lined Waterway or Outlet | $5,307,931 |
74 | Windbreak/Shelterbelt Establishment  | $4,861,974 |
75 | Critical Area Planting | $4,634,791 |
76 | Wetland Wildlife Habitat Management | $4,599,103 |
77 | Land Smoothing | $4,275,425 |
78 | Agricultural Energy Management Plan - Written | $4,263,488 |
79 | Anaerobic Digester  | $3,844,965 |
80 | Seasonal High Tunnel for Crops | $3,842,040 |
81 | Diversion | $3,827,748 |
82 | Tree/Shrub Pruning | $3,625,954 |
83 | Emergency Animal Mortality Management | $3,468,638 |
84 | Nutrient Management Plan - Written | $3,404,739 |
85 | Channel Bed Stabilization | $3,158,635 |
86 | TA Design | $3,153,661 |
87 | Forest Trails and Landings | $2,964,943 |
88 | Waste Treatment | $2,963,039 |
89 | Windbreak/Shelterbelt Renovation  | $2,624,747 |
90 | Spring Development | $2,339,064 |
91 | Field Operations Emissions Reduction | $2,151,857 |
92 | Dust Control on Unpaved Roads and Surfaces | $2,124,507 |
93 | Edge-of-Field Water Quality Monitoring-Data Collection and Evaluation | $2,026,876 |
94 | Riparian Forest Buffer  | $2,020,004 |
95 | Forage Harvest Management | $2,018,749 |
96 | On-Farm Secondary Containment Facility | $2,009,765 |
97 | Livestock Shelter Structure | $1,938,531 |
98 | Pond Sealing or Lining- Compacted Clay Treatment | $1,860,478 |
99 | Composting Facility | $1,842,943 |
100 | Clearing and Snagging | $1,733,290 |
101 | Access Control | $1,654,346 |
102 | Structures for Wildlife | $1,606,832 |
103 | Land Clearing | $1,525,498 |
104 | Irrigation and Drainage Tailwater Recovery | $1,449,412 |
105 | TA Application | $1,366,298 |
106 | Hedgerow Planting  | $1,342,930 |
107 | Water Harvesting Catchment | $1,281,660 |
108 | Amending Soil Properties with Gypsum Products | $1,275,353 |
109 | Conservation Plan Supporting Organic Transition | $1,241,600 |
110 | Wetland Restoration | $1,214,258 |
111 | Pond Sealing or Lining- Geomembrane or Geosynthetic Clay Liner | $1,204,655 |
112 | Pond Sealing or Lining- Compacted Soil Treatment | $1,073,750 |
113 | Silvopasture  | $1,055,403 |
114 | Well Decommissioning | $980,187 |
115 | Equitable Relief Payment | $961,612 |
116 | Open Channel | $941,692 |
117 | Field Border  | $897,538 |
118 | Feral Swine Management Conservation Activity - Interim | $886,139 |
119 | TA Check-Out | $841,811 |
120 | Bivalve Aquaculture Gear and Biofouling Control | $780,606 |
121 | Integrated Pest Management Plan - Written | $780,123 |
122 | Irrigation Water Management Plan - Written | $767,027 |
123 | Vegetated Treatment Area | $756,779 |
124 | Salinity and Sodic Soil Management | $598,839 |
125 | Dam- Diversion | $592,692 |
126 | Spoil Disposal | $553,815 |
127 | Edge-of-Field Water Quality Monitoring– System Installation | $544,373 |
128 | Grazing Land Mechanical Treatment | $510,606 |
129 | Shallow Water Development and Management | $508,087 |
130 | Waste Treatment Lagoon | $448,837 |
131 | Waste Recycling | $441,954 |
132 | Wetland Creation | $411,364 |
133 | Fueling Facility- Above Ground Storage | $409,512 |
134 | Livestock Confinement Facility | $330,767 |
135 | IPM Herbicide Resistance Weed Conservation Plan - Written | $329,380 |
136 | Amending Soil Properties with Gypsiferous Products | $320,666 |
137 | Sediment Basin | $286,277 |
138 | Deep Tillage | $285,004 |
139 | Grazing Management Plan - Written | $267,073 |
140 | Erroneous Underpayment | $266,474 |
141 | Pollinator Habitat Plan - Written | $255,692 |
142 | Riparian Herbaceous Cover  | $250,548 |
143 | Vegetative Barrier  | $228,588 |
144 | Surface Drain- Field Ditch | $224,311 |
145 | Pond Sealing or Lining- Soil Dispersant | $221,261 |
146 | Aquaculture Pond | $216,878 |
147 | Sinkhole Treatment | $209,161 |
148 | Irrigation Water Conveyance - High Pressure Underground Plastic | $199,927 |
149 | Other Payment | $178,850 |
150 | Denitrifying Bioreactor | $163,764 |
151 | IWC Ditch Lining- Plain Concrete | $161,326 |
152 | Surface Drain- Main or Lateral | $161,143 |
153 | Fish and Wildlife Habitat Plan - Written | $159,739 |
154 | Pond Sealing or Lining- Soil Cement | $136,302 |
155 | Filter Strip  | $135,266 |
156 | Drainage Ditch Covering | $131,988 |
157 | Forest Farming  | $131,367 |
158 | Pond Sealing or Lining- Bentonite Sealant | $128,350 |
159 | Wetland Enhancement | $120,866 |
160 | Field Operations Emissions Reduction | $119,755 |
161 | Judicial or NAD Payment | $115,704 |
162 | Road/Trail/Landing Closure and Treatment | $113,384 |
163 | Drainage Water Management | $108,294 |
164 | Drainage Water Management Plan - Written | $101,883 |
165 | Controlled Traffic Farming | $99,730 |
166 | Mine Shaft and Adit Closing | $94,038 |
167 | Stormwater Runoff Control | $87,815 |
168 | Hillside Ditch | $79,487 |
169 | Reduced Water and Energy Coffee Conveyance System | $77,127 |
170 | Prescribed Burning Plan - Written | $67,590 |
171 | Constructed Wetland | $65,052 |
172 | Fish and Wildlife Structure | $64,331 |
173 | Denitrifying Bioreactor | $61,843 |
174 | Monitoring and Evaluation | $61,311 |
175 | Agricultural Secondary Containment Facility | $57,673 |
176 | Feed Management | $54,100 |
177 | Irrigation Field Ditch | $51,038 |
178 | Residue Management- Seasonal | $46,272 |
179 | Groundwater Testing | $42,707 |
180 | Dam | $41,550 |
181 | Agricultural Energy Management Plan-Headquarters (AgEMP) | $40,965 |
182 | Livestock Shade Structure | $38,082 |
183 | Irrigation Canal or Lateral | $36,000 |
184 | Wildlife Habitat Planting | $29,353 |
185 | Control Traffic Farming | $29,308 |
186 | Contour Buffer Strips  | $28,607 |
187 | Alley Cropping  | $27,059 |
188 | Saturated Buffer | $21,670 |
189 | Precision Pest Control Application | $21,363 |
190 | Residue and Tillage Management - Ridge Till | $16,230 |
191 | Stripcropping  | $13,821 |
192 | Agricultural Energy Management Plan-Landscape (AgEMP) | $12,401 |
193 | Irrigation Water Conveyance - Canal Lining | $9,435 |
194 | Dust Control on Unpaved Roads and Surfaces | $7,530 |
195 | Trails and Walkways | $6,781 |
196 | Contour Farming | $6,483 |
197 | Vertical Drain | $6,407 |
198 | Contour Orchard and Other Perennial Crops | $5,617 |
199 | Anionic Polyacrylamide (PAM) Application | $5,337 |
200 | Dry Hydrant | $5,247 |
201 | Irrigation or Regulating Reservoir | $3,869 |
202 | Channel Bank Vegetation | $3,221 |
203 | Irrigation Water Conveyance - Low Pressure Underground Plastic | $3,078 |
204 | Individual Terrace | $2,784 |
205 | Herbaceous Wind Barriers  | $2,030 |
206 | Row Arrangement | $1,555 |
207 | Vegetated Subsurface Drain Outlet | $1,232 |
208 | Fishpond Management | $1,183 |
209 | Infiltration Ditches | $1,076 |
210 | Herbaceous Weed Control | $923 |
211 | Well Plugging | $259 |
212 | Water Well Disinfection | $216 |
Show All |
Show Less |
| Total Payments, 2017-2020 | 3,657,860,836 |